Series 4400 Installation Guide |
||
Hole size for 1/8" dia. Cable Installation: Drill 5/32" hole clear through intermediate posts. Drill 29/64" hole clear through Receiver tensioning Drill 9/32" hole 1-1/2" into the inside of the |
||
1. Install the tensioning end first with the Receiver 2. Slip the S/S flat washer over the body of the Receiver and insert the Receiver into the wood post. (Use Delrin® Washer if used in metal post) 3. Start the threaded stud attached to the cable into the Receiver and turn 3 complete turns. This will thread about 1/2 of the stud into the Receiver. |
||
4. Run the bare end of the cable through all your posts and to the end post where you be installing the Push-Lock® fitting. |
||
5. Use a hex wrench to install the lag section of the fitting into your pre-drilled pilot hole. |
||
6. Thread the Push-Lock® coupler onto the post and tighten with 7/16” wrench. |
||
7. Make sure the post side of the Push-Lock® lag is flush against the post. |
||
8. Pull the cable tightly along the side of the fitting and mark the cable 1-3/16” from the end of the fitting opposite the post. Mark and cut the cable on your mark. |
||
9. Push the cable into the hole in the
fitting as far as it will go (approximately 1-1/16”). Twist the cable in a right hand direction as you push it into the fitting. |
||
10. Go to the other end and tension the cable by
|
||
11. Tension in sequence, beginning with the outside cables and moving from side to side toward the center. |
||